Port of Felixstowe received 247 monitored inbound services in Period 2 2026-27 — 89% of 244 completed arrivals were within 15 minutes of schedule, against a national freight benchmark of 90%. The reading is in line with Period 1 2026-27; the ranges around each reading overlap. PRELIMINARY at T+2; FINAL re-publication at T+35 after Network Rail's batch correction.
- Edition
- v1.0 (industry review edition)
- Last updated
- 28 May 2026
- Next update
- Period 3 2026-27 — late June 2026
Headline facts and figures
Services monitored
247
9 a day across the six Felixstowe terminal TIPLOCs (FLXSNFL, FLXSSGB, FLXSNGB, FLXSNEW, FLXSCRS, FLXSSEW); Period 2 2026-27 (26 Apr – 23 May 2026); NROD-derived arrivals data; baseline 368 services in Period 1 2026-27; queried gauge_intelligence_v2 at 2026-05-28
Within 15 minutes
89%
244 completed services arriving within 15 minutes of schedule (Wilson 90% interval 85%–92%); baseline 91% [88%–93%] over 352 completed services in Period 1 2026-27 — ranges overlap; national freight benchmark 90% over 12,042 completed services in Period 2 2026-27; queried gauge_intelligence_v2 at 2026-05-28
Cancellation rate
1%
3 cancellations across 247 scheduled paths; down from 4% (16 of 368) in Period 1 2026-27 — a 3.4 percentage-point reduction on the period; queried gauge_intelligence_v2 at 2026-05-28
Busiest operator
GB Railfreight
172 of 244 completed arrivals (70%); aggregated by operator from TRUST toc_id; Period 2 2026-27; up from 59% share in Period 1 2026-27; queried gauge_intelligence_v2 at 2026-05-28
Context
ORR publishes aggregates only; this page publishes destination-attributed port-level data. Material to yard planning, terminal allocation, and port-side performance reviews.
What you can do with it
- Track arrivals reliability at a port, attributed by destination TIPLOC.
- Compare operator-by-operator reliability on services inbound to a single port.
- Cite the methodology in port operations and corridor reviews.
Who can use it
Port operations leaders · Terminal allocators · Rail journalists
Across Period 2 2026-27, roughly 1 inbound train a day arrived at Port of Felixstowe more than 15 minutes late, about 1 in 13 of 227 completed arrivals over the 28-day period, 17 late arrivals in total. Monitored services fell from 368 to 227, a 35% drop on the period, consistent with the May Day bank holiday weekend across deep-sea container routes. Figures aggregate every monitored journey arriving at the six Felixstowe terminal TIPLOCs inbound along the Great Eastern Main Line, drawn from Network Rail's NROD/TRUST feed. Cancellations are reported separately below.
Operators at Felixstowe-inbound
GB Railfreight ran the most felixstowe-inbound services in Period 2 2026-27 (158 of 227 completed arrivals). The full per-operator reliability comparison is deferred while the v1.0 industry review edition corrections inbox remains open.
Publishing a per-operator on-time comparison for the busiest freight operators at a single destination before the launch-cohort corrections cycle closes would treat provisional attribution as settled. The table returns at v2.0 general availability. The league-table methodology documents the comparison framework; the release cadence page sets out the four exit criteria for v2.0.
Source: Gauge Intelligence NROD-derived journey data, Period 2 2026-27. Single-destination headline figures (completed arrivals, aggregate within-15-minute rate, cancellations) continue to appear in the panels above; the per-operator breakdown is the panel deferred here.
Outbound destinations — services leaving Port of Felixstowe
Doncaster iPort took 32 of 212 outbound services (15%) in Period 2 2026-27 — the largest outbound destination from Port of Felixstowe, arriving within 15 minutes on 100% of trips.
| Inland terminal | Outbound services | Share | Within 15 minutes |
|---|---|---|---|
| Doncaster iPort | 32 | 15% | 100% (92–100%) |
| East Midlands Gateway | 26 | 12% | 92% (79–97%) |
| Trafford Park | 19 | 9% | 74% (55–87%) |
| Hams Hall | 16 | 8% | 94% (76–99%) |
| Garston | 14 | 7% | 86% (65–95%) |
| Lawley Street | 11 | 5% | 100% (80–100%) |
| Ditton | 10 | 5% | 100% (79–100%) |
| Doncaster Europort | 8 | 4% | 63% (35–84%) |
| Birch Coppice (BIFT) | 7 | 3% | 100% (72–100%) |
| DIRFT Daventry | 7 | 3% | 100% (72–100%) |
Source: Gauge Intelligence NROD-derived journey data, Period 2 2026-27. Total outbound services count every journey originating at any Port of Felixstowe terminal TIPLOC, including services to destinations not yet named in the inland-terminal registry; rows are restricted to registered inland-terminal destinations, so the share column shows each terminal’s slice of total outbound traffic and the row counts will not sum to the total. Destinations with a published archive page link to that page; destinations named in the registry but not yet published render as plain text. The bracketed range on each within-15-minutes figure is the 90% confidence range given the sample size; terminals with fewer than 5 services in the period show a dash. Cancellations are excluded. Lens: supply-chain (port-origin destination-attributed) — see league-table methodology.
What the 15-minute threshold hides
Half of Period 2 2026-27 services arrived early — the median was 3 min ahead of timetable. The long tail the A2F binary misses: 5% of services ran +29 min or more late, and 1% arrived over +65 min late. The 15-minute A2F threshold sits at the 89th percentile — 12% of services exceeded it.
Median arrival delay is essentially unchanged on Period 1 2026-27 (-3 min then, -3 min now).
| Percentile | Arrival delay |
|---|---|
| 50th percentile (median) — A2F threshold sits at the 89th percentile | -3 min |
| 75th percentile — A2F threshold sits at the 89th percentile | +3 min |
| 85th percentile — A2F threshold sits at the 89th percentile | +10 min |
| 90th percentile | +18 min |
| 95th percentile | +29 min |
| 99th percentile | +65 min |
227 services with confirmed terminal arrival in Period 2 2026-27. A2F is binary at 15 minutes — this distribution surfaces what the headline figure does not show. National 99th percentile across all freight operators: 95 min.
Baseline (Period 1 2026-27): median -3 min, p99 +79 min. Period-on-period median shift +0 min.
ORR's Freight rail usage and performance release publishes by Network Rail region and route, not by operator. This page publishes by operator and corridor.
Daily on-time arrivals across Period 2 2026-27
Daily on-time arrivals are down 0.4 percentage points on Period 1 2026-27 (93% then, 92% now).
Range 56%–100% across 28 days. Weekend mean 97% vs weekday 91% (+5.5 percentage points). Mean 92%. (24 of 28 days had recorded services.)
Period 2 2026-27 daily A2F averaged 99% across 24 observations. One or more observations fell outside the expected range (15 day(s) beyond the expected range; 14 run(s) of two-of-three days off-mean; 7 run(s) of four-of-five days off-mean), indicating an unusual event rather than ordinary noise.
Mean punctuality in Period 1 2026-27 was 93%. The current period is down 0.4 percentage points on Period 1 2026-27.
Source: Gauge Intelligence NROD-derived journey data, Period 2 2026-27. A service is counted on time when terminal arrival falls within 15 minutes of schedule. Days with no scheduled services (typically Sundays) render as gaps — a missing bar means no measurement, not a value at zero. Red bars flag days that triggered a statistical signal — see anomaly-detection methodology.
ORR's Freight rail usage and performance release publishes by Network Rail region and route, not by operator. This page publishes by operator and corridor.
Cancellation rate
In Period 2 2026-27, 4% of scheduled services were cancelled (9 of 248) — within the national mean of 4%; FOC traction, crew, and terminal decisions accounted for the largest share.
Cancellations are down 2.30 percentage points on Period 1 2026-27 (6% then, 4% now). The largest shifts in the responsible-party split are reported in the table below.
| Scheduled or activated paths | 248 |
| Cancelled (post-activation + pre-activation) | 9 |
| Cancellation rate | 4% 2%–6% |
| National cancellation rate (all freight) | 4% |
Attribution
| Responsible party | Cancellations | Share of cancelled |
|---|---|---|
| Network Rail infrastructure and possessions | 0 | 0% |
| FOC traction, crew, and terminal decisions | 8 | 89% |
| Third party | 0 | 0% |
| Unattributed | 1 | 11% |
Cancellation rate in Period 1 2026-27 was 6% across 371 scheduled paths. The current period is down 2.30 percentage points on Period 1 2026-27.
Source: NROD/TRUST activation feed and BPLAN scheduled paths, Period 2 2026-27. Cancellation rate = (post-activation + pre-activation cancellations) ÷ scheduled or activated paths. Pre-activation cancellations are TRUST CANCEL messages on schedules that never activated; post-activation cancellations have an activation and a CANCEL event. The bracketed range beside the headline rate is the 90% confidence range on the cancellation proportion given the sample size. Cause attribution uses the responsible-party mapping of the recorded cancellation reason code; see delay-attribution methodology.
What this page does not measure
Pre-activation cancellations fall outside the dataset: TRUST requires an activation event before it records a journey, so services cancelled before activation produce no TRUST record. VSTPs are excluded from the path-utilisation denominator because no Working Timetable row exists against which to measure them. Journeys without a confirmed terminal arrival are excluded from the delay distribution. The 15-minute A2F threshold is a regulatory artefact, not a natural cut-off — the "What the 15-minute threshold hides" panel surfaces the distribution behind that line.
Commercial licence
Four derivations are released to commercial-licence subscribers rather than the public archive. Each one reconciles TRUST source-data against Network Rail's Historic Delay Attribution record independently, not republished from public statistics.
- Schedule 8 net position
- Why late — delay attribution
- Schedule 4 possession exposure
- Path utilisation — corridor breakdown
Available under commercial licence. Contact [email protected] for subscription terms.
Methodology & sources
All figures derive from Network Rail's NROD TRUST feed, processed via the Gauge Intelligence ingest pipeline. Period definitions, A2F (Arrival to Fifteen), the Wilson 90% interval, daily anomaly rules, cross-view reconciliation, and delay attribution are documented at:
Data window — period boundaries and the data-as-of cutoff
League tables — cross-view reconciliation across the four analytical views
Anomaly detection — daily A2F SPC rules
Delay attribution — DAPR cause-code breakdown
Forecasting — prediction intervals and possession-exposure estimates
Revisions
No revisions to date.
A revision restates a published figure because the upstream data changed, typically a Network Rail delay-attribution refresh. The minor tier is corrected in the next release; cells affected carry an (r) flag. The intermediate tier triggers immediate amendment with an (r) flag. The wholesale tier is flagged at the top of the page and notified directly to operators and rail journalists subscribed to revision alerts.
Corrections
No corrections to date.
A correction fixes an error in the published output: an arithmetic slip, a typo, a mis-rendered chart. Revisions are different; they restate a figure because the upstream data changed. The distinction matters because corrections never silently rewrite a published number.