v1.0 industry review edition. Coverage, methodology and entity pages open for correction through March 2027. Release cadence.
Email [email protected].

Walsall Freight Terminal

Last updated 25 May 2026

Multi-operator West Midlands freight terminal at Walsall, with separate principal, GB Railfreight and Freightliner Heavy Haul sidings. Page activates once the TRUST data window covers a full closed reporting period at publishable depth for this terminal.

Operating company Multi-operator — principal terminal plus GB Railfreight (WALSFTG, May 2022) and Freightliner Heavy Haul (WALSFHH, December 2024)
Active since 1998 (principal); GBRf side May 2022; FHH side December 2024
Reception sidings
Walsall terminal sidings (WALSFT (principal), WALSFTG (GBRf), WALSFHH (Freightliner Heavy Haul))
Rail connectivity Walsall — Birmingham–Stafford route
Trailing 12-period A2F Coverage forthcoming — entity page activates once the TRUST data window covers a full closed reporting period at publishable depth for this terminal.

Operators calling

Corridors served

Methodology & sources

All figures derive from Network Rail's NROD TRUST feed, processed via the Gauge Intelligence ingest pipeline. Period definitions, A2F (Arrival to Fifteen), the Wilson 90% interval, daily anomaly rules, cross-view reconciliation, and delay attribution are documented at:

Data window — period boundaries and the data-as-of cutoff
League tables — cross-view reconciliation across the four analytical views
Anomaly detection — daily A2F SPC rules
Delay attribution — DAPR cause-code breakdown
Forecasting — prediction intervals and possession-exposure estimates

Walsall Freight Terminal is a multi-operator West Midlands site with a principal terminal joined by a GB Railfreight side opened May 2022 and a Freightliner Heavy Haul side opened December 2024. The entity page is published as a register stub while the TRUST data window catches up to a full closed period of clean data at publishable depth for this terminal; period reports activate at that point.