v1.0 industry review edition. Coverage, methodology and entity pages open for correction through March 2027. Release cadence.
Email [email protected].

Mossend

Last updated 25 May 2026

Mossend Yard — Network Rail's principal freight yard in the Central Belt of Scotland, near Bellshill in North Lanarkshire. Anglo-Scottish intermodal hub and the Scottish end of the WCML container corridor; site of the forthcoming Mossend International Railfreight Park (MIRP).

Operating company Network Rail (yard infrastructure); DB Cargo UK, GB Railfreight, Freightliner, DRS (terminal users)
Active since Mossend Yard remodelled as principal Scottish freight yard from the 1980s; Mossend International Railfreight Park (MIRP) under development by PD Stirling
Reception sidings
Mossend yard and terminal sidings (MOSEDGB, MOSEDNY, MOSEURT, MOSEGBR, MOSELHS, MOSENDW, MOSEPDF, MOSEPDS, MOSEUPY)
Rail connectivity West Coast Main Line (Mossend North Junction); Glasgow & South Western, Edinburgh & Glasgow lines
Trailing 12-period A2F Fewer than 12 closed periods of clean data on record — available once the pipeline reaches 12 complete periods.

Latest period summary

Mossend received 51 monitored inbound services in Period 2 2026-27 — a small monitored sample. 90% arrived within 15 minutes of schedule across 50 completed arrivals, against a national freight benchmark of 90%. The cancellation rate was 2% (1 of 51), improved markedly on prior periods. PRELIMINARY at T+2; FINAL re-publication at T+35 after Network Rail's batch correction.

Full breakdown — P2 2026-27 period report

Corridors served

Methodology & sources

All figures derive from Network Rail's NROD TRUST feed, processed via the Gauge Intelligence ingest pipeline. Period definitions, A2F (Arrival to Fifteen), the Wilson 90% interval, daily anomaly rules, cross-view reconciliation, and delay attribution are documented at:

Data window — period boundaries and the data-as-of cutoff
League tables — cross-view reconciliation across the four analytical views
Anomaly detection — daily A2F SPC rules
Delay attribution — DAPR cause-code breakdown
Forecasting — prediction intervals and possession-exposure estimates

Mossend Yard is the principal freight yard in Scotland’s Central Belt, sitting astride the West Coast Main Line near Bellshill. It functions as a marshalling and exchange point for Anglo-Scottish intermodal flows and is the Scottish terminus for several daily container services from the Haven ports and the West Midlands. Adjacent development of the Mossend International Railfreight Park (MIRP) by PD Stirling will add dedicated intermodal capacity on the same complex.